Pre-slab · Before the pour
Every service, penetration, cable and set-out recorded the morning of the pour. One to two hours on site, and the slab is on file for as long as the building stands.
Quick answer Pre-slab capture records set-out, penetrations and in-slab services in 3D before the concrete pour, while they can still be seen, so what is buried in the slab stays on record.
Last updated

A wall in the wrong place is a bad morning. A penetration in the wrong place, under 200 mm of concrete, is a completely different number.
And it isn’t only about getting it wrong. Everything in that slab is invisible from the moment the truck leaves, for the rest of the building’s life. Every future core, every added service, every renovation starts with somebody guessing.
The hour before the pour is the last time anyone can see it.
Hydraulic and electrical conduit, sleeves, penetrations and pits.
Cable and duct layout, on record before it disappears.
Reo layout, mesh, laps, chairs and starter bars, as installed.
Edge form, dimensions and set-out, measurable after the fact.

Every conduit, sleeve, pit and penetration as installed, in place and measurable, the morning of the pour.

Share the capture with your designer, engineer or client while there is still time to move something. Anything identified before the pour costs a fraction of what it costs after.

Any future penetration, service addition or renovation starts with knowing what is in the slab. The capture gives whoever holds the saw a known layout to work from rather than an unknown one.

Multiple trades share a slab and all of them have moved on by the pour. A dated, measurable record establishes what was installed and where, without relying on recollection months later.
Move around it, take a measurement, look at the wall from an angle nobody photographed.

Quote back the same day.