Full as-built condition
The finished building at practical completion, room by room.
Gold Coast · Brisbane · Northern Rivers and beyond
Handover & defects · At practical completion
A complete, dated 3D record of the building at practical completion, plus documented rectification of defects. The condition on the day you handed over, on file.
Quick answer Handover and defects capture records a building’s condition at practical completion, and any documented defects, in 3D, with everything behind the plaster still measurable. It gives the builder and owner a dated reference if a claim comes up later.
Last updated

The defect liability period runs for months, sometimes years, after you hand over the keys. Every claim raised in that window gets argued against whatever record exists of how the building left your hands.
If that record is a folder of photos, the arguments are about what the photos didn’t capture. Was that mark there at handover, or did it happen after?
A dated capture at PC is the reference point for everything that follows.
The finished building at practical completion, room by room.
Located within the model, not described in a list.
Before and after the fix, dated.
Surfaces, fixtures and joinery, as delivered.

The whole building, room by room, as it left your hands. The reference every later claim is measured against.

Every defect captured in place, in context, with the rest of the building around it. No more chasing a location description across a spreadsheet. Open the model, and there it is.

Capture the defect, then capture the fix. A dated pair that shows the work was done and done properly, without a site visit to confirm it.

The handover model isn’t only a defects tool. It’s a permanent record of the finished building the owner keeps, for warranties, insurance, future works and facility management.
A final 3D capture records the property’s exact condition at practical completion. It gives the builder and owner a clear, dated reference if damage or defect claims are raised after the keys are handed over.
Site teams and remote project managers get a complete, interactive model of the space, so trades can locate, review and clear specific defects before official sign-off.