Skip to content

Gold Coast · Brisbane · Northern Rivers and beyond

Pre-plaster · Before the sheeting

Pre-plaster 3D capture.

Every trade’s rough-in recorded before the sheeting goes on. Plumbing, electrical, mechanical and structure, on file for the life of the building.

Quick answer Pre-plaster capture records framing, electrical, plumbing, HVAC and every trade’s rough-in in 3D before the plasterboard goes on. Anyone can later open the record to see what is behind a wall instead of cutting it open.

Last updated

Pre-plaster 3D capture of a framed living room
  • Single visitCaptured in one pass
  • DatedTimestamped record
  • Any deviceShared on a link
  • 24–36 hrStandard delivery
02Before it’s lined

Three trades share one cavity. None of them are coming back.

Plumbing, electrical and mechanical all run through the same walls, roughed in by different crews on different days. Then the sheeting goes on and every one of those runs disappears at once.

The value shows up later, the first time someone has to find a pipe, chase a leak or hang something structural, and the only options are the drawings, if they exist, or cutting the wall open to look.

Before the plaster is the last time anyone can see it.

03Scope of capture

What goes on record.

01

Plumbing rough-in

Supply, waste and vent runs, before lining.

02

Electrical & data

Cabling, conduit, switchboards and rough-in points.

03

Mechanical & HVAC

Ducting, refrigerant lines and equipment penetrations.

04

Structure & waterproofing

Framing, bracing, fixings and membrane before tiling.

04Try it

See behind the plaster.

A finished room in the Lot 44 home. Move over it and the torch shows what a pre-plaster capture keeps on record behind the walls: studs, noggins, bracing and batts, the water pipes, the wiring, and the ducted air in the ceiling space.

Move your cursor over the room.Touch and drag over the room.

Illustration built from the lot’s plan, not a capture.

05Timing

Between rough-in and lining.

The window opens when the trades finish rough-in and closes the moment the plasterer arrives. It’s usually a few days, and it moves when a trade runs late or the lining gets brought forward.

Tell us the lining date the day it’s booked and it’s in the calendar.

06Deliverables

What pre-plaster capture delivers.

  1. 01A complete record of what’s in the walls
  2. 02Coordination before it’s covered
  3. 03A reference for future works
  4. 04Evidence when it is questioned
01 / 04
A complete record of what’s in the walls

A complete record of what’s in the walls

Every wall and ceiling cavity captured after services are installed and before lining, measurable from your desk for the life of the building.

02 / 04
Coordination before it’s covered

Coordination before it’s covered

Three or four trades share the same cavity. Capturing the rough-in gives your coordination team measured field conditions to check against the model, so clashes get found on a screen rather than behind a finished wall.

03 / 04
A reference for future works

A reference for future works

Every future renovation, service addition or repair starts with knowing what’s behind the plaster. A capture means the next person can find a pipe or a stud without opening up finished work to look for it.

04 / 04
Evidence when it is questioned

Evidence when it is questioned

Rough-in gets signed off by different trades on different days. A dated, measurable record establishes what was installed and where, so a defect or variation months later isn’t argued from memory.

07See one

Walk through a capture.

Move around it, take a measurement, look at the wall from an angle nobody photographed.

Walk through a capture. Open the 3D capture Pre-plaster · 3D capture · No app, no login
09Questions

Plain answers.

01What is a rough-in 3D scan?

A rough-in 3D scan provides a complete interactive visual record of electrical lines, plumbing pipework, mechanical services and structural framing inside the walls before plasterboard linings hide them from view.

02Why capture before closing walls?

Capturing the space at the rough-in stage documents all services hidden inside wall cavities. It protects builders from defect disputes, simplifies quality sign-offs, and shows trades exactly where to cut if alterations are needed later.

10Coverage
Serving the construction industry across Australia, the South Pacific and beyond. Select a location to start an enquiry.

Ready to document your next project?

Quote back to you within 24 hours.

Get a quote