top of page
Seashore

GOLD COAST  • BRISBANE  • NORTHERN RIVERS

3D Scanning
Gold Coast.

Construction 3D capture for Gold Coast builders, developers and architects. Based on the Tweed Region, so it's a local drive, not a day rate with travel on it.

Seashore

SERVICES

What Kybos captures on the Gold Coast.

Live sites, existing buildings and everything in between, recorded as measurable 3D data. Capture is non-intrusive, works around the trades, and typically takes one to four hours on site.

Seashore

LOCAL CONDITIONS

Check your DA before you dig.

City of Gold Coast regularly attaches dilapidation reporting to development approvals, most often where excavation, piling or demolition is happening near existing buildings. Conditions typically call for a record before work starts and another once it's done


Kybos doesn't write those reports and doesn't assess condition. We capture the site, and your building consultant, engineer or inspector works from the data. Most dilapidation capture on the Coast is booked by consultants who want better source material than a phone camera.

Think of us as the capture crew that gives your surveyors, engineers, architects and PMs the source data they need.

Seashore
Seashore

WHERE WE SIT

The documentation layer

Kybos captures and records conditions and geometry. We don't sign off on certified engineering or land survey reports, and we don't pretend to.

Think of us as the capture crew that gives your surveyors, engineers, architects and PMs the source data they need.

Seashore

COVERAGE

Across the Gold Coast.

Surfers Paradise        Southport        Broadbeach        Burleigh Heads        Palm Beach        Coolangatta        Robina       
Coomera        Helensvale        Nerang        Pimpama        Hope Island        Varsity Lakes        Currumbin        Mermaid Beach

Got a site on the Coast?
Let's get it on records

Send through the plans and a quote comes back the same day.

Frequently asked questions

Subscribe

To get industry related news, discounts and our Capability Statement

Kybos Capability Statement 2026
bottom of page