
10-20mm
TYPICAL ACCURACY
24-36hr
STANDARD DELIVERY
7+
YEARS OF EXPERIENCE
1-4hr
TIME ON SITE

Smarter Construction Starts with Better Documentation
Construction moves quickly. Missing documentation creates delays, costly rework, disputes, and uncertainty.
KYBOS creates permanent digital records of your project through high-accuracy 3D scanning, drone capture, and interactive walkthroughs.
Whether you're documenting a slab before concrete is poured or preserving what's behind finished walls, you'll always have the evidence you need.
The Answers a Capture Already Has.
Every scan provide answers long after the construction stage is complete.
More than a 3D Scan
Professional construction capture that continues delivering value long after the project is complete.
Verify installations before they're covered and minimise expensive rectification.
Reduce Costly Reworks
Resolve Disputes Faster
Time-stamped visual record that supports claims and project accountability.
Improve Project Coordination
Allow teams and stakeholders to revisit the site remotely at any time.
Protect Future Maintenance
Locate hidden services without unnecessary demolition or investigation.
Permanent Digital Records
Every record milestone is securely documented for future reference.
Interactive Walkthroughs
Explore projects online from any device without returning to site.

PROVEN ON SITE
Trusted by builders, architects and developers across SEQ & NSW
Construction projects fail documentation when it matters most: during disputes, defect claims and handover.


What's your role?
Different roles need different things from a site record. I scope every project to the stages that carry real risk, and nothing more.

SERVICES
Four stages where the evidence disappears. Most projects use two.
Before you break ground. A dated, measurable record of neighbouring properties and existing site conditions.
Before the pour. Every in-slab service, penetration and set-out captured while it's still visible.
Before the sheeting. Every trade's rough-in on record, so nobody has to cut a wall open to find a pipe.
At practical completion. Condition on the day you signed off, plus documented rectification.
MORE SERVICES

TRY A 3D CAPTURE
A real pre-plaster capture from a live site. Move through it, take a measurement, open the floor plan. This is what lands in your inbox.
PRE-PLASTER 3D CAPTURE

1
Tell us about you project, location, and construction stage.
2
Generally 1–4 hours on site, working around the trades. No shutdown, no exclusion zone.
3
24–36 hours later. Access an interactive online model, accurate documentation for design purposes. Forward it to anyone who needs access. Accessible on any devices. No app, no login.






