# Construction Dossier

> Every stage of your build captured in measurable 3D and delivered as an offline record you own forever. Dilapidation, slab, frame, defects and handover.

Source: https://www.kybos.au/construction-dossier/
Last updated: 2026-11-12
Publisher: Kybos (kybos.au), Gold Coast, Brisbane and Northern Rivers, Australia

---

Gold Coast · Brisbane · Northern Rivers and beyond

# Long-term smart documentation Your build, documented forever.

From the untouched site to the finished handover, every stage of a build vanishes into the next. A Construction Dossier captures them all and hands you a permanent, measurable record of the biggest thing you’ll ever build.

**Quick answer** A Construction Dossier captures each stage of one build in measurable 3D and hands the owner an offline copy that transfers with the property, with no subscription and no ongoing fee.

[Get a quote](https://www.kybos.au/contact-us/)See the stages

[Open the 3D capture](https://my.mpskin.com/en/tour/jwbn8dw7n)

- **Single visit** Captured in one pass
- **Dated** Timestamped record
- **Any device** Shared on a link
- **24–36 hr** Standard delivery

## You’ll spend a fortune on this build. You’ll remember almost none of it.

From the condition of the site before day one, to what’s sealed behind the walls, to exactly how it was handed over. Every stage of a build tells a story that’s gone the moment the next one covers it.

A Construction Dossier captures each one, measured and kept, so whatever you need to know later, whichever stage it’s from, the answer is close to hand.

A click away, not a jackhammer.

## Three things worth understanding before you build.

- **Once**
The number of times each stage can be captured. Miss the window and it’s gone for good.

- **Forever**
How long you keep the record. An offline copy that’s yours, that never expires.

- **Any stage**
What you can revisit, from the untouched site to the final handover, months or years later, without lifting a tool.

## Five windows. Each one closes for good.

- 01 Dilapidation · before the work starts
- 02 Pre-slab · before the pour
- 03 Pre-plaster · before lining
- 04 Defects · at practical completion
- 05 Handover · at handover

01 / 05

### Dilapidation · before the work starts

A record of your site’s existing condition, and neighbouring structures, before anything moves. Your protection if a dispute or defect claim arises later.

02 / 05

### Pre-slab · before the pour

In-slab services, penetrations and set-out, captured before the concrete goes down and buries them for good.

03 / 05

### Pre-plaster · before lining

Framing, plumbing, electrical, HVAC and rough-in, recorded before the walls close up and every service becomes a guess.

04 / 05

### Defects · at practical completion

The condition and rectification record at PC, so the defects list is backed by evidence, not memory.

05 / 05

### Handover · at handover

Final condition as delivered, the reference point for how the build was handed over. Thermal imaging of the envelope can be added as an exterior layer.

## Build it, and keep every stage.

Move the slider and the Lot 44 home goes up, from the empty lot to the handover. Each copper mark is one of the five capture windows: pass it and that stage is kept, before the next one covers it.

Loading the 3D

Stage **The site, before works**

- Dilapidation
- Pre-slab
- Pre-plaster
- Defects
- Handover

Illustration built from the lot’s plan, not a capture. Drag the model to turn it.Swipe the model sideways to turn it.

## Most 3D captures are rented. A dossier is owned.

If the point of a record is that it still works in fifteen years, it can’t depend on anyone still being in business. Your dossier is delivered as an offline copy that doesn’t need our servers, our software, or us.

Feature | Construction Dossier | Hosted 3D capture |

Access lasts | Permanently | While the subscription runs |

Internet shareable | Yes | Yes |

Survives the provider closing | Yes | No |

Transfers with the property | Yes | Usually not |

Ongoing costs | None | Annual fee |

## Photos capture what someone thought to photograph.

A photo holds one angle, chosen on the day, at whatever resolution the phone managed. Twelve months later, the detail that matters is the one nobody shot.

A 3D capture holds the whole space. Any point, any angle, measurable later, by anyone with the link, including people who were never on site.

No one has to predict the future.

## The best closing gift a builder can give.

The dossier doesn’t stop being useful at handover. It goes to the owner, and it keeps earning its place for as long as they own the house.

Living in it

### No more guessing at the stud finder.

Mounting a TV, adding a power point, chasing a leak. Open the dossier, find the pipe, measure the distance, drill once.

Renovating it

### The next architect starts from reality.

No exploratory demolition to find where the services run, and no variation the week after work begins.

Selling it

### Proof, where every other seller has a promise.

A measurable record of the structure, waterproofing and services, captured as it was built.

For the builder

### A defect claim three years on.

The dossier is your record too: dated evidence of what was installed and how, from before anything was covered.

## Plain answers.

01What exactly do I own?

Everything in your scope, as your own files: the full point cloud, floor plans, photos and panoramas, and the 3D model, plus an offline viewer that opens the walkthrough on a computer without internet, our servers or us. Delivered on a drive and by download. No licence, no expiry, no account required. Copy it, back it up, hand it on with the property.

02What if Kybos doesn’t exist in ten years?

Your dossier keeps working. It doesn’t depend on our servers, our software, or us still being here. A permanent record that relies on a company staying solvent isn’t permanent.

03Do I have to take all five stages?

No. Take the stages your project needs. Most builds start with pre-slab and pre-plaster, since those are the two windows that close hardest.

04How accurate is it?

Typically within 5–20 mm depending on the capture method: accurate enough to locate a stud, a pipe run or a cable before anyone drills into it. On request, we check it against on-site measurements.

05How much notice do you need?

Around three days for each stage, and capture takes roughly two hours on site. We work around the trades and we don’t stop the job.

06My build is already underway. Too late?

Not necessarily. Every stage still ahead of you can be captured. If the plaster isn’t up yet, pre-plaster is the one to book now.

07How fast do I get it?

Standard delivery is 24 to 36 hours after capture. You’ll have a shareable link first, with the offline copy to follow.

[Gold Coast & Northern Rivers Home base · NSW–QLD border →](https://www.kybos.au/contact-us/#region=gold-coast-northern-rivers)
[Brisbane & Sunshine Coast Regular coverage →](https://www.kybos.au/contact-us/#region=brisbane-sunshine-coast)
[Sydney By arrangement →](https://www.kybos.au/contact-us/#region=sydney)
[New Caledonia South Pacific · larger projects →](https://www.kybos.au/contact-us/#region=new-caledonia)
[Melbourne By arrangement →](https://www.kybos.au/contact-us/#region=melbourne)
[Adelaide Larger projects →](https://www.kybos.au/contact-us/#region=adelaide)
[Perth Larger projects →](https://www.kybos.au/contact-us/#region=perth)

Serving the construction industry across Australia, the South Pacific and beyond. Select a location to start an enquiry.

## Ready to document your build?

Book the stages together and the rate comes down. Quote back within 24 hours.

[Get a quote](https://www.kybos.au/contact-us/)

- Phone[0451 052 500](tel:+61451052500)

- Email[info@kybos.au](mailto:info@kybos.au)

- BasedNSW–Queensland border
